Past Projects
List of services
-
Merri Creek Sewer Rehabilitation Project
New sewer rehabilitation & reworks on the Merrie Creek network in Preston and Coburg. Early works program to repair Merri Creek Sewer Main.
Merri Creek Sewer Rehabilitation Project
-
Campbell Street, BENTLEIGH
PCB Repair on a 225 diameter Sewer Reticulation. Approximately 5m deep.
Campbell Street, BENTLEIGH
-
Carlton Main Sewer Main Upgrade
Rehabilitation of a 25m manhole using mechanised shaft excavation techniques and prefabricated Glass Reinforsed Plastic (GRP) shaft lining systems.
Carlton Main Sewer Main Upgrade
-
Graingers Rd
Melbourne Storm Water Pit Construction
Graingers Rd
-
Lower Dandenong Rd, MENTONE
Repair 100dia HCB & 150dia Retic. Construction 1070dia Manhole.
Depth 6 meters. Ground Conditions: Running Sand
Lower Dandenong Rd, MENTONE
-
Lower Dandenong Road, MENTONE Part 2
Repair 100dia HCB & 150dia Retic. Construction 1200dia Manhole.
Depth 6 meters
Lower Dandenong Road, MENTONE Part 2
-
Regional Rail Link
Raise Melbourne Water Storm-Water Pit
Regional Rail Link
-
Yarra Valley Water / Lend Lease
Location and repair of 150 diameter Sewer Reticulation
Yarra Valley Water / Lend Lease
-
531 Barkly Street
14/11/2011. Set up traffic control, saw cut road, excavated over previous dig out down to 2.4m & installed shaft support system.
531 Barkly Street
-
Broken Pipe Under Concrete Slab
Relining Broken Sewer Pipe Under Concrete Slab After House Construction
Broken Pipe Under Concrete Slab
-
City West Water
Replace 35 meters of 150 diameter Sewer Reticulation approximately 4.5 metres deep inside factory warehouse.
City West Water
-
City West Water
Replace approximately 34m of 225 diameter Sewer pipe, by shaft and tunnel method approximately 7 metres in depth. Caused by a concrete slurry entering sewer system and blocking drains.
City West Water
-
City West Water
Construction of Pressure Reducing Station.
City West Water
-
City West Water
Replace approximately 40 meters of 150 diameter Sewer Reticulation by Shaft & Tunnel method approximately 5 meters in depth with restricted access. Sewer system had been blocked with grout.
City West Water
-
City West Water
Construction of Sewer Access Chamber over existing 225 diameter Siphon Line.
City West Water
-
City West Water
Locate 150dia Pressure Pipe under Maribynong River
City West Water
-
City West Water
Repair of HCB approximately 6 meters deep by Hand Excavation.
City West Water
-
JHL Civil
Elster Sewer Upgrade Project. Excavation of a 2.4m dia shaft for the construction of a 1600dia manhole 9m in depth, in excessive ground water.
JHL Civil
-
Negri Constructions
Negri Constructions (for Vic Roads)
Construction of 1070dia Walk in Sewer Access Chamber approximately 7 metres in depth.
Negri Constructions
-
South East Water
Construction of 150dia Sewer Branch in sand below the water table.
South East Water
-
Yarra Valley Water
Lift and relaying of approximately 45 metres of 225dia EW pipe due to concete filling and blocking retic.
Yarra Valley Water
-
Yarra Valley Water
Knock down & rebuild of 1070dia Sewer Access Chamber in environmental sensitive area.
Yarra Valley Water
-
Yarra Valley Water
Knock down of 1070dia Cast In Situ Sewer Access with restricted access
Yarra Valley Water
-
Yarra Valley Water
Repair 150 diameter Sewer Reticulation. Restricted access between factories.
Yarra Valley Water
-
Pentecost Inlet
Installation of stainless steel chase in manhole
Pentecost Inlet
-
Yarra Valley Water
Emergency replacement of 750dia concrete Retic.
Yarra Valley Water
-
Yarra Valley Water/Lend Lease
Dig out and repair of 150dia HCB at the Moreland Hotel, Brunswick
Yarra Valley Water/Lend Lease