Blog

Sep07

CCF Earth Awards Winner

- posted by Ian Campbell on

Jun03

We have break through!

- posted by Admin RBM on

 

 

The team at RBM Drainage have been hard at work on new sewer rehabilitation works on the Merrie Creek sewer network in Preston and Coburg. We were awarded this contract from JBH & KBR on behalf of Melbourne Water late last year.

These photos are of the end of tunnel excavation and show the moment of break through to the upstream manhole. See more of this project in our Current Projects Gallery.

Back with more soon.

May31

Merri Creek Sewer Rehabilitation Works

- posted by Emma Altas on

Tunnel for John Holland Merri Creek Sewer Main Rehabilitation

Current Sewer is on the verge of collapse

RBM Plumbing & Drainage have been engaged by JBH & KBR Joint Venture to carry out early works program to repair Merri Creek Sewer Main.

First part of works require the lowering of 525dia concrete relieving main between the Merri Creek Main and the Merri Creek Relieving Main by approximately 1 meter. This requires excavation of Tunnel by hand from existing 1500dia reinforced Manhole Wall approximately 1.5meters thick, removal of existing concrete pipe. Including the installation of Tunnel Support System 16 meters in length.

Apr11

New Merri Creek Project

- posted by Admin RBM on

 

RBM Drainage have been hard at work undertaking new sewer rehabilitation works on the Merrie Creek network in Preston and Coburg. We were awarded this contract from JBH & KBR on behalf of Melbourne Water late last year.

The upgrade will improve the sewer network and protect public health and safety by reducing pressure on the existing system to prevent potential sewer collapses upstream, reduce sewer spills in extreme wet weather and reduce system blockages.

Construction activities include:

  • Reconstruction of the sewer network
  • Upgrade of existing manholes
  • Decommissioning of existing sewer
  • Reinstatement of sewer following construction

This project will be completed in mid 2016.

Feb18

Broken Pipe Under Concrete Slab

- posted by Emma Altas on

Relining Broken Sewer Pipe Under Concrete Slab After House Construction is a key service that we provide to all domestic builders saving them thousands of dollars in time and materials.

Sep03

Lateral Lining System

- posted by Emma Altas on

RBM is excited to announce that we are launching a new Lateral Lining System in September 2013.

The Performance Liner Lateral System is a unique cured in-place process that allows the installer the freedom to position the liner anywhere in the pipe by inverting through an inspection shaft/boundary trap.

Please feel free to contact us if you would like to know more.

Aug21

RBM launches updated website

- posted by Ian Campbell on

Check out our new, updated site, we have added new features for your convenience:

  • Mobile application to view the website & contact us anywhere, anytime from your mobile
  • Easy online subscription to our Newsletter
  • Testimonials to read what our valued clients are saying about RBM Drainage



Check back often as we add new features:

  • Easy industry Downloads
  • Updated project information